The Fibre Channel hubs and switches, if installed, must be powered on before the host to
insure proper loop initialization.
The power up procedure includes the following steps:
1. Turn on the expansion enclosures.
2. After the last enclosure was powered on, wait for all the disks to be ready (steady green
LED for each disk).
3. Turn on hubs/switches (if attached).
4. Turn on the DS4000 storage server.
5. Turn on the host application server.
The power-down procedure includes the following steps:
1. Turn off the host application server.
2. Turn off the DS4000 storage server.
3. Turn off hubs/switches (if attached).
4. Turn off the expansion enclosures


本文来自ChinaUnix博客,如果查看原文请点:http://blog.chinaunix.net/u2/66684/showart_1085208.html
您需要登录后才可以回帖 登录 | 注册

本版积分规则 发表回复

  

北京盛拓优讯信息技术有限公司. 版权所有 京ICP备16024965号-6 北京市公安局海淀分局网监中心备案编号:11010802020122 niuxiaotong@pcpop.com 17352615567
未成年举报专区
中国互联网协会会员  联系我们:huangweiwei@itpub.net
感谢所有关心和支持过ChinaUnix的朋友们 转载本站内容请注明原作者名及出处

清除 Cookies - ChinaUnix - Archiver - WAP - TOP