18 .A customer wants to consolidate 5 System p servers to a Power 780. Each of the 5 systems run as a
single LPAR. Three systems run applications which are certified by the vendor for AIX 5.2 only. One
system runs AIX 5.3, and the last one runs AIX 6.1. Which of the following is a supported configuration forconsolidation?
A.Create three AIX 5.2 LPARs, one AIX 5.3 LPAR, and one AIX 6.1 LPAR.
B.Create one AIX 7.1 LPAR hosting three AIX 5.2 WPARs, one AIX 5.3 LPAR, and one AIX 6.1 LPAR.
C.Create one AIX 7.1 LPAR hosting three AIX 5.2 WPARs, one AIX 5.3 WPAR, and one AIX 6.1 WPAR.
D.Create one AIX 7.1 LPAR hosting three AIX 5.2 WPARs, and one AIX 6.1 LPAR hosting one AIX 5.3
WPAR.
19.An administrator is creating an LPAR that will employ N_Port ID Virtualization (NPIV) and Partition
Mobility. The SAN administrator wants to see both virtual WWPNs for each virtual fibre channel adapter
log into the SAN fabric in order to zone them.ln order to activate the secondary virtual WWPNs the
administrator attempts to migrate the inactive LPAR to a target server. The migration fails.Which of the
following is a valid reason for the failure?
A.Partition Mobility is available only for active partitions.
B.The partition was not enabled as a Mover Service Partition.
C.A partition must be booted to the SMS menu at least once before the migration will succeeD.
D.A partition cannot be migrated until its operating system verifies that PowerVM Enterprise Edition has
been licenseD.
20.While restoring a mksysb to a VIO client, the installation halts with a message indicating lack of space.
The mksysb being used for the restore is 4GB in size. The client LPAR has an assigned 32GB LUN
through the VIC Server. What is wrong?
A.The extracted files plus required temporary working storage exceeds 32GB.
B.The logical volumes defined in image.data, together require more than 32 GB.
C.The logical volumes defined in bosinst.data, together require more than 32 GB.
D.The PP_SIZE in bosinst.data value would make the logical volumes > 32 GB
26.A system administrator is implementing VIO Server on Power 770 for network virlualization, and plans
to use Shared Ethernet Adapters (SEA). A sizing exercise was perlormed to determine the the resource
requirements for the VIO Server hosting the SEA, assuming an MTU of 9000. Some time after the
completion of the sizing exercise, the requirements are revised and the MTU is now expected to be 1500
instead of 9000.Which of the following statements is true?
A.The processor requirements will be smaller, and the receive buffer requirements will be smaller.
B.The processor requirements will be smaller, and the receive buffer requirements will be greater.
C.The processor requirements will be greater, and the receive buffer requirements will be smaller.
D.The processor requirements will be greater, and the receive buffer requirements will be greater.
32.A broken SAN LUN hdisk3 on VIOl must be replaceD.In the °I s map -all ± out put t he ad mi ni str at or
identified the following entry for this disk:
On which client LPAR ID is the broken SAN LUN?
A.LPARID=1O
B.LPARID=12
C.LPARID=14
D.LPARID=16
35.Which was the first release of IBM ito support Multipath I/O (MPIO) at the client LPAR level, when the
same storage is served from redundant VIO Servers?
A.6.1.0
B.6.1.1
C.7.1.0
D.7.1.1
39.An administrator has created a network link aggregation device on a VIO server using the mkvdev
-lnagg commanD.When trying to diagnose problems with the device the administrator is advised by the
network department to ensure that Link Aggregation Control Protocol (LACP) has been configureD.Which
of the following actions will ensure that LACP will work?
A.Change the mode to 802.lq
B.Change the mode to 802.3ad
C.Change the mode to standard
D.Change the mode to round_robin
44.A customer is buying a new Power 795. It will contain 3 processor books, with all of the 96 cores
activateD.They are evaluating their requirements for AIX 7 licenses. Some of the LPARs will be using AIX
Enterprise Edition and some will be using AIX Standard Edition. In this configuration, what is the
maximum number of cores which can be allocated to an individual LPAR?
A.16 for Standard Edition, 32 for Enterprise Edition
B.32 for Standard Edition, 32 for Enterprise Edition
C.32 for Standard Edition, 96 for Enterprise Edition
D.96 for Standard Edition, 96 for Enterprise Edition |
|